I INTRODUCTION

The oil and gas industry in the UK is in a period of transition – while continuing to address the realities of the UK continental shelf (UKCS) as a mature and complex basin, the industry is also adapting to a net zero future, which has been accelerated by effects of the covid-19 pandemic.2 These factors have shaped trends in the UK oil and gas industry's transactional and operating landscapes in recent times, as well as informing a number of recent legislative developments – in particular relating to innovation and 'decarbonisation' initiatives.

In May 2020, the UK Oil & Gas Authority (OGA) launched a consultation to amend its formal 'maximising economic recovery' (MER UK) strategy (described in more detail below) noting the vital role that the industry has to play in the energy transition while continuing to ensure that energy demand is met, both in the UK and globally for at least the medium term.3 The UKCS still represents a significant resource in terms of both current production and future potential.4 In 2019, production from the UKCS accounted for 63 per cent of the UK's oil and gas demand5 and it is estimated that 4 billion barrels oil equivalents (boe) is yet to be discovered in the UKCS.6

As part of the MER UK strategy, the OGA has encouraged an approach of 'right assets, right hands' – ensuring that assets (as investment opportunities) are in the most appropriate hands as a key enabler in the drive to maximise economic recovery. In the last five years, 35 per cent of the current production has changed hands and deal activity during 2019 was similar to 2018 with total M&A spend reaching approximately US$5.6 billion. M&A activity has slowed down in the first half of 2020 because of the declining oil price and the effect of the covid-19 pandemic, with the value of UKCS upstream deals announced in the first half of 2020 being approximately US$450 million.7 A variety of transactions occurred across all stages of the upstream oil and gas life cycle, including exploration prospects, pre-development opportunities, producing fields and late-life assets. Recent transactions have resulted in a more diverse ownership landscape on the UKCS and a significant trend that has developed is the increasing proportion of assets, production and investment opportunities that have been acquired by private equity-backed companies. Infrastructure investors have increased their exposure to the midstream across various asset classes including pipelines, storage and LNG.

The UKCS retains significant resources and a continued focus on exploration and development of new fields. Many exciting prospects continue to be developed, and production has been on the upswing. Six new Field Development Plans were approved by the OGA in 2019.8 Total production from the UKCS was around 600 million boe in 2019, or 1.6 million boe per day (similar to 2018 and 20 per cent higher than 2014).9 The OGA's estimate for proven and probable10 UK reserves as at the end of 2018 is 5.2 billion boe.11 The UKCS still retains over 10 to 20 billion boe yet to be produced12 which could sustain production from the UKCS for another 20 years or more.13

II LEGAL AND REGULATORY FRAMEWORK

i Domestic oil and gas legislation

The principal legislation governing exploration and production of crude oil, gas and shale gas in the UK is the Petroleum Act 1998 (as amended) (the Petroleum Act). The Petroleum Act governs all oil and gas exploration and production in the UK (other than onshore in Northern Ireland), and underpins a regime whereby licences are granted, by the OGA (and by the Welsh Ministers, for onshore oil and gas in Wales, and the Scottish Ministers, for onshore oil and gas in Scotland), to persons to 'search and bore for and get' petroleum. Licence holders are granted the right to explore and develop a specified geographical area. Ownership of petroleum vests in the Crown, and petroleum produced within the licence area transfers from the Crown to the licence holder at the well head.

The Petroleum Act is supplemented by the Energy Act 2016, the Infrastructure Act 2015 and various environmental and health and safety legislative provisions.

ii Regulation

The Department for Business Energy and Industrial Strategy (BEIS) is responsible for setting energy and climate change mitigation policies and establishing the framework for achieving the policy goals in those areas.

From 1 October 2016, the OGA was formally established as a fully independent regulator and a government-owned company, with the Secretary of State for Business, Energy and Industrial Strategy (the Secretary of State) as the sole shareholder. The Secretary of State is ultimately responsible to Parliament for the OGA.

The OGA is the entity responsible for petroleum licensing and regulation of the upstream oil and gas sector, including:

  1. oil and gas licensing;
  2. oil and gas exploration and production;
  3. oil and gas fields and wells;
  4. oil and gas infrastructure; and
  5. carbon storage licensing.

In response to the decline in production from the UKCS, the UK government commissioned a review of the UK offshore oil and gas recovery and regulation led by Sir Ian Wood. The concluding recommendations of this review included the establishment of a new regulator (the OGA). The key principle of the recommendations, and the stated policy of the UK government, is to maximise the cost-effective recovery of UK resources. The Infrastructure Act 2015 amended the Petroleum Act, to implement an official MER UK strategy, which was produced by the Secretary of State and came into force in March 2016. The MER UK strategy is binding on the OGA, various industry participants, the Secretary of State and licence holders, operators and owners of offshore installations. The OGA has enforcement powers in respect of compliance with the MER UK strategy, and it is required to act in accordance with its MER UK strategy when:

  1. exercising its functions under the Petroleum Act or part 2 of the Energy Act 2016;
  2. exercising functions or powers under a petroleum licence; and
  3. using its ancillary powers; for example, to assist or advise the government.

iii Treaties

The UK is a signatory to treaties including the Energy Charter Treaty, which regulates energy-specific matters, and the Geneva Convention on the Continent Shelf 1958 and the UN Convention on the Law of the Sea, which sets the limits of the state's territorial sea and access to the continental shelf and beyond.

Additionally, the UK is a party to conventions governing the recognition and enforcement of foreign arbitral awards including the UN Convention on the Recognition and Enforcement of Foreign Arbitral Awards, the Geneva Convention on the Execution of Foreign Arbitral Awards 1972 and the UN Convention on the Settlement of Investment Disputes between States and Nationals of Other States.

In respect of tax, the UK has an extensive network of double tax treaties with other jurisdictions that are broadly designed to prevent a taxpayer from having to pay tax in more than one jurisdiction on the same income, profits or gains. The extent to which any UK taxing rights may be restricted under a particular treaty depends on the nature of the income, profits or gains in question and the terms of the relevant treaty.

III LICENSING

The Petroleum Act vests all rights to petroleum in the Crown but permits the OGA to grant licences to 'search and bore for and get' petroleum to persons deemed fit. Under the Petroleum Act, exploration for and production of petroleum in the UK and on the UKCS can only be undertaken under the terms of these licences. A company wishing to participate in the UK upstream oil and gas sector must bid for a licence or acquire an interest in existing assets, with any acquisition being subject to regulatory consents.

The OGA is now responsible for issuing licences through competitive licensing rounds that generally take place every year, and the MER UK strategy is applied by the OGA in each licensing round. Separate rounds are held for seaward (offshore) licences and landward (onshore) licences. In exceptional circumstances, where there are compelling reasons provided by a company, the OGA may issue a licence outside of a licensing round.

Licences take the form of a deed, pursuant to which the licensee is bound to observe the conditions of the licence. These detailed terms and conditions are prescribed in a series of 'Model Clauses', which are set out in secondary legislation under the Petroleum Act. The model clauses applicable to a particular licence are those that are in force at the time the licence was granted and are not affected by subsequent sets of model clauses, except through specifically retrospective measures.

UK licences are both contractual and regulatory in nature – contractually, being executed as a deed and providing for the contractual transfer of rights from the Crown to the licensee, and regulatory, because the model clauses are encompassed in statutory regulations, and Parliament may unilaterally amend the terms upon which a licence is granted. Legally, only one licence exists, although a licence may be granted to one or more licensees, who will be held jointly and severally liable in respect of obligations arising under the licence.

The Petroleum Licensing (Applications) Regulations 2015 contain the application process for licences. All applications must be made in the prescribed form and for a specific area. The OGA will only grant a licence to an entity that has the appropriate technical and financial capacity to contribute to the MER UK strategy. The OGA considers all applications on an individual basis, and companies must meet certain criteria, including technical competence, financial capacity and tax considerations (the OGA routinely corresponds with HMRC for information on any tax issues).

The different types of licences currently being issued are:

  1. seaward production licences: these are the main offshore production licence, which run for three successive periods or terms. The initial term is associated with exploration, the second with development and the third with production. However, the licence requires fulfilment of the relevant work programme, agreed with the OGA, before it can proceed from one term to the next – but a licensee who fulfils the required obligations and obtains the relevant consents quickly during the initial terms, will not be prevented from commencing production under the licence prior to the third term. Production licences expire automatically at the end of the term unless the licensee has advanced the work programme sufficiently to commence the next term. The licence will expire at the end of its initial term unless varied by agreement, or the licensee has completed the work programme, all sums have been paid, and the licensee has relinquished 50 per cent of the initial licence area. Each production licence also requires payment of an annual fee (known as rental), charged on an escalating basis for each square kilometre covered by the licence at that date and for licensees to relinquish areas that are not being exploited;
  2. landward production licences: the onshore equivalent of seaward production licences as described above (formerly referred to as petroleum exploration and development licences);
  3. offshore innovate licences: the innovate licence offers greater flexibility during the initial and second term as the applicant can propose the durations of the initial and second terms. The 'offshore innovate licence' replaced the traditional, promote and frontier versions of the seaward production licence, described below (which still remain relevant for many existing offshore production licences); and
  4. exploration licences: an exploration licence is non-exclusive and covers the UK's entire offshore area apart from those areas covered by any production licences that are in force at the time. These are commonly used by seismic contractors who gather data to sell rather than exploiting the resources themselves, or by holders of a production licence who wish to explore outside the areas where they hold or require exclusive rights. The OGA grants both seaward and landward exploration licences. The annual payment is significantly lower than that of production licences and covers exploration relating to hydrocarbon production, gas storage, carbon capture and sequestration or any combination. An exploration licence grants rights to explore for petroleum, but not to extract it and enables licence holders to carry out seismic surveys and to drill wells for core-sampling to a maximum depth of 350 metres below the seabed.

The 'traditional, promote and frontier licences' are no longer issued, but many remain in existence:

  1. traditional licence: this was the most common type of offshore production licence. They were granted with licence term lengths of four years for the initial term to complete the initial work programme, following which the licensee was required to relinquish 50 per cent of its acreage to move to the next phase. The second term was for another four years, and finally reaching a production phase for an 18-year third term (other than in relation to the 27th and 28th licensing rounds where greater flexibility was introduced for certain licences);
  2. promote licence: aimed at small and start-up companies, applicants did not need to prove technical or environmental competence or financial capability before the award of the licence, but they were required to do so within two years of the start date of the licence. Otherwise, the terms of the various phases and relinquishment obligations were the same as a traditional licence; and
  3. frontier licence: this licence had an exploration phase of six years to allow companies to evaluate larger areas and look for a wider range of prospects, but the terms varied based on the terrain (two more years for standard frontier licences and five additional years for the more challenging West of Shetland frontier licences). Licensees were required to relinquish 75 per cent of the acreage at the end of the third year of the initial exploration phase, and a further 50 per cent at the end of the initial exploration phase.

The 32nd UK Offshore Licensing Round opened in July 2019, offering a total of 796 blocks or part-blocks across the main producing areas of the UKCS. In September 2020, the OGA offered 113 licence areas over 260 blocks or part-blocks to 65 companies. There will be no licensing round in the 2020–2021 period in order to allow relinquishment of current areas. The OGA is expected to engage with the industry on the timing and nature of the next licensing round.14

IV PRODUCTION RESTRICTIONS

There is no national oil company in the UK that is directly involved in oil and gas exploration and production activities in the UKCS. Oil and gas exploration and production are regulated by restrictions on the award and transfer of licences, and requirements relating to approval of work programmes and how that work is performed. There are no special regulatory requirements that apply to the exports of oil or oil products, other than the payment of applicable duties or taxes, and compliance with EU oil stocking obligations. In the event of an actual or threatened emergency in the UK that will affect fuel supplies, the Secretary of State may use emergency powers under the Energy Act 2016 to regulate or prohibit the production, supply, acquisition or use of substances used as fuel.

V ASSIGNMENTS OF INTERESTS

The OGA's consent is required for a licence to be sold, transferred, assigned or otherwise dealt. Any transaction that results in a company joining a licence, or withdrawing from a licence, is deemed to be a licence assignment. The OGA will consider any assignment made without prior consent, a very serious breach of the model clauses and grounds for immediate revocation of the licence or to reverse the assignment. There are a number of issues that the OGA considers when deciding whether to give approval, including: compliance with the EU 2013 Offshore Safety Directive, the technical and financial capacity of the assignee, decommissioning costs, effect on operatorship arrangements and fragmentation of licence interests (i.e., creation of less than 5 per cent interests).

The company selling its licence interest (the transferor) must apply to the OGA for its consent. The transferor will need to obtain much of the information the OGA needs from the acquiring company (the transferee). Consent will not be granted unless the OGA has all required information. The OGA reviews and considers the form of the deed of assignment used by the parties and provides for approved draft deeds of assignment. Licence assignment applications are processed online through the UK Energy Portal, and the OGA aims to process applications within 10 working days. If the assignment results in a change of operatorship, this may extend the process to up to 30 working days. Assignment consents are valid for 90 days after the completion date specified in the application form.

The OGA's consent to proceed with a change of control of a licensee is not expressly required; however, the OGA does have the power to require either a further change of control, or revocation of the licence, upon a change of control. As a result, best practice is to apply to the OGA in advance of a change of control and seek comfort that the OGA will not exercise its powers. The application should demonstrate that the proposed change of control would not impact the ability of the licence holder to meet its obligations under the licence. The OGA may require a parent company guarantee from the new corporate parent to replace any existing parent company guarantee that may have been issued before the change in control.

The creation of a charge on a licence also requires the consent of the OGA. To facilitate ordinary course transaction financing, and to eliminate the cumbersome need for prior consent, 'open permission', which is a form of automatic consent, applies to any fixed or floating charge or debenture. The licensee must give notice to the OGA within 10 days of creation of the charge, providing certain information about the charge. If the holder of a charge intends to enforce the security interest, it will be caught as a licence assignment, and the procedures described above in respect of licence assignments will apply.

VI TAX

The tax system applicable to oil and gas related activities in the UK (and the UKCS) consists of a special fiscal regime, comprising three principal elements:

  1. ring fence corporation tax (RFCT): the normal corporation tax regime is modified in its application to companies producing oil in the UK and UKCS: a 'ring fence' applies to prevent taxable profits from oil and gas extraction from being reduced by losses from other activities. The rate of RFCT is currently 30 per cent;
  2. supplementary charge (SC): the rate of SC is currently 10 per cent. This is not strictly corporation tax, but is charged as if it were an amount of corporation tax on ring fence profits to which financing costs are added back (and is subject to an allowance regime designed to encourage investment); and
  3. petroleum revenue tax (PRT): this is an additional level of tax on the profits derived from particular fields. The rate of PRT was reduced to zero with respect to chargeable periods ending after 31 December 2015 but it has not been abolished so losses can be carried back against past PRT payments.

Following the effective abolition of PRT, RFCT and SC together result in an effective marginal tax rate of 40 per cent for all oil and gas fields in the North Sea.

Investment in the UKCS is encouraged by tax relief being provided for expenditure on research, exploration, appraisal and production, either through capital allowances (broadly, the UK's form of allowable 'tax' depreciation) and, once production has commenced, through tax deductions for expenses incurred wholly and exclusively for the purposes of an eligible trade. The government has also signed decommissioning relief deeds with oil and gas companies to provide certainty on the tax relief they will receive when decommissioning assets, as further described below.

In the context of UKCS transactions, decommissioning issues, and particularly the question of with whom the economic burden of decommissioning liabilities should lie, have frequently been a significant challenge to transactions involving the transfer of UKCS licence interests. The traditional position has been that buyers would provide sellers with an indemnity for all decommissioning liabilities whether they arise on or before the agreed economic date or date of the agreement.

There has been, however, an increasing trend toward sellers of licence interests retaining a proportion of the decommissioning liability (as historically, it was likely that the new owners would not be able to get effective tax relief for decommissioning costs, because of having paid insufficient amounts of corporation tax and SC by the time the decommissioning of those assets occurred). This has been particularly relevant in the context of late-life assets where a seller is likely to have significantly greater tax capacity than a buyer. However, in the context of 'right assets, right hands' and the MER UK strategy, following an announcement in the Autumn 2017 Budget, the Finance Act 2019 introduced transferable tax histories (TTHs) for oil and gas companies, which provide companies buying North Sea oil and gas fields with certainty that they will get tax relief for the decommissioning of the asset as, on purchasing the asset, they are able to make a joint election for the buyer to acquire some of the previous owner's tax history (namely, historic profits on which ring-fenced corporation tax and supplementary charge have been paid). The buyer is then be able to set the costs of decommissioning the fields at the end of their lives against the TTH.

The recent amendments enacted are beneficial for a number of UKCS participants including:

  1. taxpayers selling licence interests who may be able to dispose of UKCS assets and thereby unlock capital to be employed in further exploration and development activity (whether in the UK or elsewhere) if a transaction can be structured such that the seller's TTH is transferred to the buyer; and
  2. buyers of such assets who may have greater certainty that tax relief will be obtained for the cost of decommissioning activity.

VII ENVIRONMENTAL IMPACT AND DECOMMISSIONING

i Environmental impact and safety

While oil and gas activities are primarily regulated by the licence and the Petroleum Act, various other statutory provisions apply in respect of environmental and safety issues. The Model Clauses also generally require licensees to avoid harmful methods of working, by, for example, operating in accordance with 'good oilfield practice' and to take all steps practicable to prevent the escape of petroleum, including into any waters in or near the vicinity of the licensed area.

The principal regulators for health and safety in the UKCS are BEIS, the Health and Safety Executive, and a partnership between the two – the Offshore Safety Directive Regulator (OSDR), established in 2014 pursuant to the European Commission Offshore Safety Directive (2013/30/EU) (the 2013 Directive), which itself was a direct response to the Deepwater Horizon disaster in 2010.

Following the Piper Alpha offshore platform explosion in 1988, and the subsequent Cullen Inquiry, the UK developed the Offshore Installations (Safety Case) Regulations 1992 (replaced by the Offshore Installations (Safety Case) Regulations 2005). The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015, impose obligations on the operator to prepare safety cases, including risk assessments to be approved by OSDR for all offshore installations, and together with the Offshore Petroleum Licensing (Offshore Safety Directive) Regulations 2015 and the Merchant Shipping (Oil Pollution Preparedness, Response and Co-operation Convention) (Amendment) Regulations 2015, transpose the 2013 Directive. The Pipelines Safety Regulations 1996 impose separate duties on operators of pipelines.

The OGA has the power to issue financial penalty notices carrying fines of up to £1 million under the Energy Act 2016, in respect of: (1) a failure to comply with a duty to act in accordance with the MER UK strategy; (2) a breach of a term or condition of an offshore licence; or (3) other breaches of the Energy Act 2016 that are sanctionable thereunder. It may also issue an enforcement notice, order the removal of the operator of a licence and ultimately revoke a licence for one or all of the licence holders in the event of non-compliance with applicable requirements.

The Offshore Petroleum Regulator for Environment & Decommissioning (OPRED), an agency of BEIS, is principally responsible for enforcing the environmental regime applicable to offshore oil and gas activities (and also decommissioning) in the UK. The Offshore Environmental Civil Sanctions Regulations 2018 (the OECS Regulations) gives OPRED powers to impose civil sanctions in respect of breaches of some existing offshore oil and gas environmental regulations. Previously, the breaches could only be sanctioned through criminal prosecution. It is relevant to note that the new civil sanctions will only apply to breaches that can currently be subject to criminal prosecution, and as such, the OECS Regulations do not create any new offences – only an alternative means for OPRED to sanction these breaches. OPRED can impose a penalty in circumstances where it is satisfied that a breach has been proven beyond reasonable doubt (the criminal burden of proof).

These new civil penalties will apply to offences under the following regulations, being the key UK environmental and safety regulations relating to the offshore oil and gas industry:

  1. the Offshore Combustion Installations (Pollution Prevention and Control) Regulations 2013;
  2. the Offshore Petroleum Activities (Oil Pollution Prevention and Control) Regulations 2005;
  3. the Offshore Installations (Emergency Pollution Control) Regulations 2002;
  4. the Merchant Shipping (Oil Pollution Preparedness, Response and Co-operation Convention) Regulations 1998; and
  5. the Offshore Chemicals Regulations 2002.

The 2013 Directive also extends liability for environmental damage under the EU Environmental Liability Directive (2004/35/EC) to offshore oil and gas operations. In the event of an oil spill in UKCS waters, the licensees will have unlimited financial liability for the prevention and remediation of such environmental damage and are required to make adequate financial provision to cover liabilities for the duration of operations.

In addition to statutory obligations, liabilities may arise under common law torts such as nuisance and negligence, or under contract. Parties suffering harm or damage caused by operations of an offshore installation may claim under a voluntary oil pollution compensation agreement to which all offshore operators active in the UKCS are party. Membership of the offshore pollution liability agreement (OPOL), is a condition of the OGA granting a licence and so all operators will in practice be party. OPOL generally subjects operators to strict liability for pollution damage, and the cost of remedial measures up to a maximum of US$250 million per incident. Above the US$250 million cap, recovery by third parties will be dealt with as a matter of civil law.

ii Decommissioning

Oil and gas operators in the UK are increasingly decommissioning their assets as they are reaching the end of their useful economic lives. Operators' expenditure on decommissioning is rising and the average expenditure for decommissioning is approximately £1.5 billion per year.15

The Petroleum Act imposes an obligation on licensees to pay for the decommissioning and proper removal of offshore installations from the seabed, other than in exceptional circumstances. Decommissioning of these installations (including pipelines) is regulated by BEIS, through OPRED. The OGA, pursuant to the MER UK strategy and the Energy Act 2016, is required to assess decommissioning programmes to ensure they meet the MER UK strategy's principal objectives on the basis of cost savings, future alternative use and collaboration.

The Secretary of State, under Section 29 of the Petroleum Act, has the power to serve a 'Section 29 Notice' to anyone owning an 'interest' in an installation 'otherwise than as security for a loan' and associated companies (broadly 50 per cent owned direct or indirect affiliates) of companies that are directly liable. The Section 29 Notice will either specify the date by which a decommissioning programme for each installation or pipeline is to be submitted or, as is more usual, provide for it to be submitted on or before such date as the Secretary of State may direct. At first instance, a Section 29 Notice would typically be issued to the operator of the field and each of the licensees, but the power of Secretary of State to issue a Section 29 Notice to other relevant parties is broad and should be considered in transaction structures in an M&A context. It is expected that the OGA will send a Section 29 Notice to this wider class of parties if it finds the decommissioning arrangements proposed by the operator and licensees to be unsatisfactory.

The Secretary of State has the power to withdraw Section 29 Notices – for example, in respect of withdrawing licensees – but it would be unusual for this to occur without a replacement notice being served on an incoming licensee. Additionally, BEIS has the power to reissue any Section 29 Notice (under Section 34 of the Petroleum Act) but the risk of a licensee (or other interested party or related person as set out above) re-incurring liability is always present, and they may be potentially liable for the decommissioning of that field until decommissioning is complete.

The Section 29 Notice requires the recipient to submit a decommissioning programme (setting out the methods and measures to decommission disused installations or pipelines, or both). Once the decommissioning programme is approved, following the OGA's review of the details including the cost estimates, the notice holders are legally obliged to carry it out on a joint and several liability basis. If a programme is not carried out or its conditions are not complied with, the Secretary of State may, by written notice, require remedial action to be taken. Failure to comply with any such notice is an offence, and the Secretary of State can carry out the remedial action and recover the costs from the person to whom the notice was given.

The Secretary of State can require decommissioning security at any time, with the security being ring-fenced from creditors in an insolvency situation, if it believes that there is an unacceptable level of risk of decommissioning costs falling to government. The industry and the regulators have developed a Decommissioning Security Agreement, commonly entered into by all licensees, providing for security to be held on trust by an independent security trustee. This security may be provided by a standby letter of credit, performance bond or insurance product, parent company guarantee or cash.

As at 25 January 2019, OPRED has agreed nine security agreements with operators, and a total of £844 million has been set aside for decommissioning.16 OPRED monitors the financial health of operators to determine their financial position compared with their anticipated costs to decommission assets. For example, it assesses operators' ratio of assets to liabilities in their accounts and has access to data provided by a consultancy firm on operators' financial health.

In response to concern that a lack of certainty about decommissioning tax relief had led operators to set aside money for decommissioning on a pre-tax (rather than post-tax) basis, in 2013, HM Treasury introduced decommissioning relief deeds to give operators greater certainty about the tax relief they will receive for decommissioning. These deeds guarantee that tax relief for decommissioning will not be lower than under 2013 rules and provide certainty that operators will receive tax relief should they incur any additional decommissioning costs because of the default of another party. The rationale is that this will reduce the amount of security required (before security was given without taking account of tax relief, therefore, increasing the amount), which will free up funds for asset transactions and investments, and discourage early decommissioning.

VIII FOREIGN INVESTMENT CONSIDERATIONS

i Establishment

To be a licensee, a company must have a place of business in the UK, meaning that they have a staffed presence in the UK, they are registered as a UK company or they have a registered UK branch.

ii Capital, labour and content restrictions

There are no restrictions on the movement of capital or access to foreign exchange and no local content or local hiring requirements applicable to oil and gas operations in the UK.

iii Anti-corruption

The UK Bribery Act 2010 establishes offences relating to giving bribes, taking bribes, bribing a foreign public official and failing to prevent bribery and applies to activities in the UK and can apply to activities overseas. A bribe is a financial or other advantage and is deliberately broad. A company guilty of an offence is liable to a fine.

IX CURRENT DEVELOPMENTS

i The energy transition and the MER UK strategy update

Both government and industry are facing the changing circumstance of the 'energy transition' – driven by economic, geological and political realities. In 2019, legislation was passed in the UK to bring all greenhouse gas emissions to net zero by 2050 and separately, in Scotland, legislation was passed to achieve net zero by 2045.

On 6 May 2020, the OGA launched a consultation to update the MER UK strategy to support the UK's net zero target and to address climate change – proposing that the MER UK strategy should be carried out in a way that is fully compatible with the transition to net zero through the amendment of the central obligation of the MER UK strategy. This would include an obligation on the industry to take appropriate steps to assist the Secretary of State in meeting the net zero target, including by reducing as far as reasonable in the circumstances greenhouse gas emissions from sources such as flaring and venting and power generation and supporting carbon capture and storage projects (CCS). The consultation closed on 29 July 2020. An Energy White Paper outlining legislative proposals for new low-carbon technologies is expected to be published in autumn 2020 and will provide further clarity on policy objectives and the regulatory regime for CCS and hydrogen.

The industry is embracing the energy transition and a number of supermajors have already set out their intentions in achieving net zero by investing in and developing low-carbon technologies and reducing emissions. It is expected that the industry's response to the net zero target will include investment in renewable energy sources, decarbonising oil and gas production, and deploying carbon mitigation technologies such as CCS and hydrogen production.17 CCS is considered to be a necessity in achieving net zero and a public consultation concluded in 2019 identified potential business models, opportunities and barriers to the re-use of oil and gas assets for CCS and further work is likely to be done in partnership with industry to develop guidance on the technical feasibility and requirements for re-use of oil and gas assets and decommissioning. Additionally, Oil and Gas UK – the leading industry body for the UK offshore oil and gas industry – has continued working with key stakeholders in the UKCS (as well as the government) to accelerate progress towards the net zero target and has recently launched its 'Roadmap 2035: A Blueprint for Net Zero' which identifies key actions to be taken, including utilising the industry's expertise and position to assist in the development of scalable CCS and hydrogen projects in the UKCS.18

The industry has the skills, technology and capital to contribute to the net zero target and it is well equipped to be at the forefront of the energy transition.

ii Brexit

On 31 January 2020, the UK ceased to be a member of the European Union (EU) and there is a transition period until 31 December 2020.19 The full impact of Brexit on the UK upstream oil and gas industry will depend on the agreement reached between the UK and the EU during the transition period; however, it is not certain that Brexit would have a significant impact as the UK's upstream oil and gas regulatory regime is highly developed independently of EU law. The industry could be exposed to additional tariffs and the restrictions on the import of goods and services, which would have commercial and financial ramifications.


Footnotes

1 Michael Burns is a partner and Naomi Nguyen is a senior associate at Ashurst.

7 www.mergermarket.com (Mergermarket deal reporting).

9 ibid.

10 Reserves that are not yet proven, but that are estimated to have a better than 50 per cent chance of being technically and commercially producible.

12 ibid.

13 ibid.